Here are some pictures for your viewing pleasure.
Stormwater Retention Pond, Before and After:
Here it is... the site of the 2014 Summer Olympics!
Ok, not really, but look at the size of that pool.
Waterline installation:
This is the Glu-lam power pole along the south side of the project. Although the contractor was digging within acceptable limits, Woodworth had the power pole held for good measure while a couple of catch basins and storm drain were installed.